Re-map or not?
A two-minute check for one space or unit: re-map, short check, missing season, or no action.
1. Has this space or unit been mapped under its current use?
2. Since that mapping, has any of these happened?
- New or replaced cooling or HVAC, or a change to its capacity
- Controller replaced without data showing it performs the same
- Unit relocated, or the space rebuilt, extended or split
- Racking or layout change that can block airflow
- New temperature class or a new use (e.g. staging became storage)
3. Is there a signed yearly review of this space from the last 12 months?
4. Has there been a smaller change with unclear impact?
- New shelving, door or seal changes, more door traffic, a new staging spot
5. Do monitoring trends worry you?
- Mean or the spread between warmest and coldest probe moving toward a limit
- Repeated or unexplained excursions
6. Can outside weather reach the space, and is one season still not mapped?
7. Is the last full mapping older than the interval in your master mapping plan (typically 3–5 years)?
Answer the first question
Up to seven yes/no questions, one space or unit at a time.
Triggers first, calendar last.
EU GDP asks for mapping before use, then again based on risk and after significant changes. It sets no fixed interval. So the check starts with what makes an old mapping invalid, then looks at evidence (review, trends, seasons), and only then at the calendar. The outcome is general guidance; your QA or Responsible Person decides and records it.