Short answer

From 2019 to 2025, about 54 GDP non-compliance reports were published EU-wide in EudraGMDP. Only four can be confirmed as involving temperature or cold chain, all at wholesalers, and each sat beside wider quality-system failures. In routine inspections the picture is different: temperature control and monitoring are among the most-cited major GDP findings in the UK MHRA data, and the findings are about method and documentation. Monitoring probes not at the mapped extremes, contractor mapping never approved, a store reconfigured without checking the mapping, and excursions closed with MKT without a root cause.

Licences are rarely lost over temperature alone

When an EU inspectorate finds serious GDP failures, it can publish a non-compliance report in EudraGMDP. These reports are rare: 6 in 2019, 6 in 2020, 6 in 2021, 11 in 2022, 11 in 2023, 5 in 2024 and 9 in 2025.

Of roughly 54 reports in those seven years, four can be confirmed from public summaries as involving temperature or cold chain. About one in twelve.

YearAuthorityTemperature findingConsequence
2020German authorityStorage without temperature control, alongside no quality systemAuthorisation suspended
2022INFARMED, PortugalCold-chamber breakdown procedure not triggeredSuspended for cold-chain products only (report later withdrawn)
2023RP Freiburg, GermanyTemperature not controlled and widely out of specification, alongside Responsible Person and traceability failuresRe-inspection (report later withdrawn)
2025HPRA, IrelandNo assurance that packs stayed under cold-chain control in transit, alongside supply outside the licenceAuthorisation revoked, pharmacy-level recall

Two lessons. Temperature failure never appears alone: inspectors read it as a symptom of a weak quality system. And the Portuguese case shows the commercial risk exactly. A distributor can keep its licence and still lose its 2 to 8 °C business.

None of the public summaries mentions temperature mapping. That does not mean mapping is fine. A mapping gap is usually graded "major" and fixed through corrective action long before a site fails outright.

Routine inspections find method and paperwork gaps

Only the UK MHRA has published GDP deficiency data in detail. It is British data and mostly from 2016, so read it as a pattern, not a current EU rate.

What MHRA inspectors actually wrote down:

Almost none of these is a hardware failure. They are failures to justify, approve and keep documents current. Where does the probe sit, and why? Who approved the study? Is it still valid after the last change?

What inspectorates in Benelux, DACH and the Nordics signal

None publishes ranked deficiency statistics. Three public signals are still worth knowing.

No report from the Netherlands, Denmark, Sweden, Norway or Finland appears in the EudraGMDP GDP non-compliance lists for 2021 to 2025.

The clauses behind every finding

EU GDP (2013/C 343/01) sets the outcome. WHO TRS 961 Annex 9, Supplement 8 gives the method. The wording below was checked against the official text on EUR-Lex.

ClauseWhat it requires
EU GDP 3.2.1Map before use, under representative conditions. Place monitoring devices where the mapping shows the extremes. Repeat per risk assessment or after significant changes to the facility or temperature-control equipment.
EU GDP 3.3Calibrate at defined, risk-based intervals, traceable to a national or international standard. Set alarm levels appropriately and test alarms regularly.
EU GDP 3.3.1Validate computerised systems, such as monitoring software, before use. Secure and back up the data.
EU GDP 9.2Report and investigate excursions. Use route risk assessment. Calibrate transport monitoring equipment at least once a year.
EU GDP 9.4Use qualified equipment for temperature-sensitive products. Map temperature-controlled vehicles under representative conditions, taking seasonal variation into account.
WHO Suppl. 8Empty and loaded studies, summer and winter. Loggers roughly every 5 to 10 m at three heights. At least 7 days for ambient warehouses, 24 to 72 hours for cold rooms. Loggers within ±0.5 °C. The report states where monitoring sensors go.

A 12-point self-check

  1. Every storage area mapped before first use, under representative conditions. (GDP 3.2.1)
  2. The mapping report says where monitoring probes go, and each probe is there. (GDP 3.2.1)
  3. Re-mapping triggers defined; change control reviews the mapping after layout, racking or HVAC changes. (GDP 3.2.1)
  4. Summer and winter data for areas exposed to outside air. (WHO Suppl. 8)
  5. Every contractor mapping report reviewed and formally approved by you. (GDP chapter 7)
  6. Monitoring sensors calibrated traceably, across the range you use. (GDP 3.3)
  7. Alarm levels justified, alarms tested with a record. (GDP 3.3)
  8. A cold-room breakdown procedure that someone has practised. (GDP 3.3)
  9. Monitoring software validated, access-controlled, backed up. (GDP 3.3.1)
  10. Every excursion investigated for root cause; MKT only as support. (GDP 9.2)
  11. Transport: route risk assessment, loggers calibrated yearly, vehicles mapped with the seasons in mind. (GDP 9.2, 9.4)
  12. Temperature records complete and contemporaneous. (GDP chapter 4)

Get the full report as a PDF

6 pages: the four EU cases, the MHRA evidence, the clause map, the 12-point self-check, and all sources.

Get the PDF

Frequently asked questions

Is temperature mapping required under EU GDP?

Yes. EU GDP 3.2.1 requires an initial temperature mapping of the storage area before use, under representative conditions, with monitoring devices placed where the mapping shows the extremes. Small rooms of a few square metres at room temperature can use a risk assessment instead.

How often must a warehouse be re-mapped?

EU GDP sets no fixed interval. Re-map according to your risk assessment and after significant changes to the facility or the temperature-control equipment. WHO guidance gives "every three years" as an example.

Can MKT be used to release product after an excursion?

Only as support for an investigation. The Dutch IGJ states that MKT may not compensate for or replace temperature control, and MHRA has cited excursions closed with MKT and no root-cause investigation.

What do inspectors look at in temperature monitoring systems?

Probe positions justified by mapping, traceable calibration across the range, alarm levels and alarm tests, and validation of the software under GDP 3.3.1. Denmark's medicines agency named temperature-monitoring systems in its 2026 GDP inspection focus.

What percentage of GDP inspections find temperature problems?

No current EU figure exists. The inspectorates in Benelux, DACH and the Nordics publish no deficiency rankings, and the latest detailed MHRA GDP breakdown is from 2016. Be careful with percentages you see in vendor blogs.

Method and sources

EU cases come from ECA Academy's summaries of EudraGMDP reports, not from a direct database query. Two of the four were later withdrawn, and companies are not named here. The confirmed count is a minimum. MHRA figures are UK data. This article is general information, not a compliance decision for your site.

  1. EU Guidelines on Good Distribution Practice, 2013/C 343/01 (EUR-Lex)
  2. ECA Academy: The GDP non-compliance reports of 2025, and the overviews for 2024, 2023, 2022 and 2021
  3. ECA Academy: GDP non-compliance report, cold-chain products (Portugal)
  4. ECA Academy: GDP non-compliance reports from Austria and Ireland
  5. MHRA: GDP 2016 deficiency data (PDF)
  6. MHRA: GMP inspection deficiency data trending 2015 (PDF)
  7. MHRA Inspectorate blog: Temperature mapping, an introduction
  8. Lægemiddelstyrelsen: Årets fokus ved GMDP-inspektioner i 2026
  9. IGJ: FAQ on the EU GDP guidelines (PDF, Dutch)
  10. HPRA: Guide to Good Distribution Practice, IA-G0046 (PDF)
  11. IPQ: MHRA GDP deficiencies, January to June 2010
  12. WHO Technical Report Series 961, Annex 9, Supplement 8: Temperature mapping of storage areas (2015)